top of page

Still have questions?

We’d love to help.

Contact us for a free consultation and get personalized answers based on your property and goals.

Frequently Asked Questions in Ontario

Laneway Suites

  • A laneway suite is a self-contained residential unit built on a property that backs onto a laneway. It’s commonly used for rental income, extended family, or added property value.

  • Yes, laneway suites are permitted in many Ontario cities, subject to zoning, lot size, and access requirements. Regulations vary by municipality.

  • Costs vary based on size, design, and site conditions. Most laneway suites in Ontario typically range from mid to high six figures. A detailed estimate is provided after review.

  • Construction usually takes 6–8 months, after permits are approved. Prefab options can reduce construction time.

  • Yes. Laneway suites are commonly used as long-term rental units, subject to local rental bylaws.

Laneway-suites_in ontario

Not Sure Yet ?
Get a Free Consultation

Laneway SuitesContact Us
Garden-suite-in-Toronto

Garden Suites

  • A garden suite is a detached residential unit built in the backyard of a primary home, often used for family members or rental purposes.

  • Garden suites are allowed in many Ontario municipalities, depending on lot size, setbacks, and zoning rules. A feasibility check is required.

  • A garden suite is located in the backyard, while a laneway suite requires laneway access. Both are secondary dwelling units but follow different zoning rules.

  • Garden suite costs depend on size, foundation type, and finishes. We provide transparent pricing after reviewing your property.

  • Yes. Garden suites are ideal for multigenerational living, aging parents, or adult children.

Not Sure Yet ?
Get a Free Consultation

Garden SuitesContact Us

Prefab & Modular Homes

  • Prefab and modular homes are built off-site in controlled environments and then assembled on your property, offering faster timelines and consistent quality.

  • Yes. Modern prefab homes are designed to meet or exceed the Ontario Building Code and perform well in Canadian weather conditions.

  • Prefab construction significantly reduces on-site build time. Most projects are completed weeks or months faster than traditional builds.

  • Absolutely. Layouts, finishes, and features can be customized to match your needs and budget.

prefab-modular-in-ontario

Not Sure Yet ?
Get a Free Consultation

Prefab & ModularContact Us
Pool Houses in ontario

Pool Houses & Backyard Structures

  • Pool houses are used as changing rooms, guest spaces, entertainment areas, or storage, and can include bathrooms or kitchenettes.

  • Yes. Most pool houses require permits depending on size, utilities, and intended use.

  • With proper insulation and utilities, a pool house can be designed for year-round use.

Not Sure Yet ?
Get a Free Consultation

Pool HousesContact Us

Permits & Regulations

  • Permits typically include zoning review, building permits, and inspections. Requirements vary by municipality.

  • Permit timelines range from 2–6 months, depending on the city and project complexity.

  • Yes. Each municipality has its own zoning bylaws, which affect size, height, setbacks, and usage.

Pool Houses in ontario
Pool Houses in ontario

Costs & Investment

  • Yes. Most backyard suites are designed as long-term rental units, offering strong income potential.

  • Rental income depends on location, unit size, and market demand. Many homeowners use backyard suites as long-term investments.

  • For many Ontario homeowners, backyard suites provide rental income, property value increase, and housing flexibility.

Laneway-gardensuites-in Ontario

General Questions 

  • Snap Hub Homes specializes in the design and construction of laneway suites, garden suites, prefab & modular units, and pool houses. We provide end-to-end solutions including design, permits, and construction.

  • Yes. We manage the entire process — from initial design and feasibility review to permits, approvals, and full construction — so you don’t need to coordinate with multiple consultants.

  • The full process typically takes 6–12 months, depending on project type, permit timelines, and customization. Prefab and modular projects are usually completed faster.

  • We work in most Ontario municipalities, including the GTA and surrounding areas. Local zoning and regulations are reviewed before confirming any project.

  • The first step is a free consultation where we review your property, discuss goals, and assess feasibility based on zoning and regulations.

bottom of page